question

Jyhjeng D2 avatar image
0 Likes"
Jyhjeng D2 asked Jyhjeng D2 commented

Could Not Dispatch Task Sequence

Hi:

I am doing a drill in "Flexsim: Simulation Software Primer." It is on pages 113-114. I created a packing machine and defined its breakdown timetable. It is shown below. otherbreaks.jpg

However, after running the program, it showed "Could Not Dispatch Task Sequence.

Packing_1 is not a valid dispatcher, and the task sequence could not be dispatched."

dispatch-task-sequence-01.jpg

The flexsim program is attached. Primer_3-3A.fsm

Before I added the timetable, OtherBreaks, everything was fine. And the program is shown below. Primer_3-3.fsm

Can anyone help?

FlexSim 22.0.1
could not dispatch task sequence
otherbreaks.jpg (135.2 KiB)
primer-3-3a.fsm (493.5 KiB)
primer-3-3.fsm (493.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered Jyhjeng D2 commented

Did you copy the "OperatorBreaks" time table and onyl change the members? The down function is set to have the member travel to a location. As a fixed resource, the combiner/processor can not do travel operations, so you should choose a different option like "Stop Object" instead.

1679904208485.png


1679904208485.png (7.8 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jyhjeng D2 avatar image Jyhjeng D2 commented ·

You are right, I just copied from Time Tables OperatorBreaks to make the OtherBreaks, and thank you for your suggestion; now it works.

0 Likes 0 ·