Hello. In this case I has assign On Break time to Operator at 8:00:10 to 8:00:25 this duration is 15 Sec.
So, In case of Operator has Task on hand it will On Break when his task at on hand are finish. In this picture the time is 8:00:13 but Operator not Break.
He will finish task at 8:00:15 and Break then.
So, Duration of Break are 15 Sec. The Operator will Break at 8:00:15 to 8:00:30. I use down function in Time Table and assign Priority of Down Function 100 and Priority of Process 101.
So, If I want to assign On Breake time are in the same eventhrough Operator will late from break time because task on hand (Break at 8:00:15 and Resume at 8:00:25 on the same). How can I setting this.
I has attached model here. Thank You.
Time Table but the Task on hand.fsm