question

Ali Asghar avatar image
0 Likes"
Ali Asghar asked

Shift scheduling and Experimenter

CBM Factory model current_autosave.fsm

Hi,

I am having issue in developing timetable for my model shift schedule and run it over for 20 working days. I tried using experimenter but since I am not sure I am doing it write I am unable to test results.

Can anyone help me in this regard and solve my problem. I have attached my model for reference too. Also kindly explain how you used the experimenter and scheduling tool.

Thanks and Regard

FlexSim 19.0.0
schedulingexperimentorstatistical analysis
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

0 Answers

·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.