I want to implement an article about the content mentioned in the literature.
The content is as follows
At simulation time 12, workpiece 3 is processed on machine B. Since both workpiece 4 and workpiece 1 need to go to machine B for processing, the timing of work dispatch decision will be faced at this time. According to the status information, workpiece 4 is currently blocked on machine C, and workpiece 2 must go to machine C for processing. Therefore, selecting workpiece 4 can unblock machine C, allowing workpiece 2 to continue processing. However, if workpiece 2 is selected 1, then workpiece 3 will be blocked because workpiece 4 is still blocked on machine C and cannot leave the machine, resulting in the inability to continue processing. Therefore, this study selects workpiece 4 as the action for dispatching decisions.
Finally I have another problem, I want to calculate the slack time.
But I don’t know how to complete the following description in flexsim
The processing of workpiece 4 is completed at simulation time 8, and the status of the job attribute is updated to processing completed. Since workpiece 4 is blocked on machine C, the status of machine C and workpiece 4 is updated to be blocked. Allowance and remaining time. Refer to the workpiece information to know that workpiece 1, workpiece 2 and workpiece 3 will be delivered late. The allowance time can be obtained by subtracting the current time from the delivery date and subtracting the remaining processing time. The allowance time is 3, 4 and 3 minutes respectively. , the remaining time is the distance between the delivery date and the current time. After calculation, the remaining time for workpieces 1 to 4 is 2, 6, 8, and 3 minutes respectively.allcombos-22-0-1-fm.fsm