question

Eduardo avatar image
0 Likes"
Eduardo asked Joerg Vogel edited

Can I force any toolbox to end during the simulation?

I am currently utilizing MTBF/MTTR (Mean Time Between Failures/Mean Time To Repair), and I'm interested in whether I can terminate these actions prematurely to gather new statistical data for MTBF/MTTR. Specifically, when the simulation initiates, the MTBF/MTTR cycle would conclude when the repair time (TTR) ends, triggering the start of a new time between failure (TBF) and time to repair (TTR) cycle based on the established configuration. To acquire a fresh sample, I intend for an actuator(table tiem) to activate at any point within the TBF time frame, instructing the simulation to initiate the TTR process immediately, thereby enabling the collection of a new statistical sample for this tool. How can I develop this conceptual model that I want to incorporate into my simulation? I am considering incorporating a code into the time table to act as the trigger for this action. However, I'm unsure how to instruct the software to terminate that cycle before its programmed completion.

I would greatly appreciate your assistance.

FlexSim 23.2.1
customcodemtbf mttr timetable
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered Joerg Vogel edited

MTBF/MTTR cycle is an automatism that creates a set of stop and resume pair. If you intend to establish an immediate MTTR interval then you can call a stop on an object and some time later by a delayed message or a delay activity in process flow a resume action. You can set an individual Stop ID to exclusively resume this stop action later. Please test it yourself if an own stop resume pair suits your request.