I build a model in 24.0 and when I want to run it in 24.2 it behaved differently. The following picture shows the logic:
The stack of pallets has a label with the destination of the Decision Point 3. At DP 2 the following process flow is fired:
If the outobject 1 equals the label value the token goes to send item and the stack should go right. This worked perfectly but in 24.2 it won't. If I put DP 3 for instance on the next conveyor the stack nicely stops (it can't enter the conveyor because the pallet with sheets is already there) I have tried replacing the conveyor, using new transfers, moving the DP 2 to the right etc. but nothing seems to work. Anybody else an idea or is this a bug introduced in 24.2? Model is attached (the model is much larger but I was able to separate this part)