I have a task executer reaches a network node at a pickup location. After loading the part, I want to set the point that follows the path 3 ft behind the current tracking point. I then want the TE to continue on its path, but all future stops, turns, arrivals will be based on the new point.
Will I need to create a NN 3 ft behind the pickup location and ressign the TE to that node?
Thanks.