question

David Chan avatar image
0 Likes"
David Chan asked Rodrigo Lamas commented

operator not responding to priority

te-priority-model.fsm

Hi

Need help to explain why priority won't work.

I have attached a model for an operator to server two machines. The logic is that after the operator transport the material to second machine he is to continue with the second process till the material is sent to the sink. The upper model I have added priority both to the process and use transport. I am expecting the operator to complete the second process before coming back to the source. But it is not. He is performing as though I have not added the priority as in the second model.

Is my understanding of the priority wrong?

David

FlexSim 16.2.1
prioritytaskexecutors
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Rodrigo Lamas avatar image
0 Likes"
Rodrigo Lamas answered

@david.chan Please see the model attached, I do the same with processflow. With this tool you can define step by step the operator activities easily, can be a good solution because with the 3D and conection method to do that I think you need to use the task sequences to make this priority. Regards!

processflow-example.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

David Chan avatar image
0 Likes"
David Chan answered Rodrigo Lamas commented

@Rodrigo Lamas

Thanks for your model. Just want to do the model in only 3D as the people that I am working with does not know PF.

Thanks

David

· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Rodrigo Lamas avatar image Rodrigo Lamas commented ·
0 Likes 0 ·