Please excuse my ignorance but I am new to FlexSim and have only completed the introductory tutorials. I am trying to simulate movement of bulk material through a conveyor network. This requires setting a route end to end before a movement, the routes being composed of a number of conveyors to an end infrastructure device like a ship loader or stacker. The routes share conveyors in some locations. I previously using routing tables in Arena for this. Can someone give me guidance for my best bet at an approach in FlexSim before I investigate in detail? I am looking at around 20 routes using 30 conveyors. Please see the diagram below for further detail.
Thanks for any assistance.