question

Mohamed Serag avatar image
0 Likes"
Mohamed Serag asked Sam Stubbs answered

How can i release pallets from conveyorswith the below time intervals?

I am building a model for finish product cooling room, pallets delivery by one forklift, storing 70 pallets is on 10 roller conveyors, i need to start releasing batch of 8 pallets after 4.333 hrs (after filling the 10 conveyors , and then each batch release after 28 minutes constantly

conveyorsystem
capture.png (103.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Sam Stubbs avatar image
0 Likes"
Sam Stubbs answered

I'm sorry it's taken us a while to get to your question. I just have a quick follow up question, which version of the software are you using? If you are using 7.7 or later then you can use a system of logic called Process Flow. What you are wanting to do could be done with process flow. Essentially what you would do, is push the pallets to a list. Then when you want to pull them, you'd set up a Process Flow with a Scheduled source. The source would be set up to fire at 4.333 hours and then every 28 minutes thereafter, which it would then send a token to pull your 8 pallets off the list and move them. Again, this is only if you are using software version 7.7 or later though. Otherwise we'd have to find an alternative method.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.