Chart delay table times

I have 6 agv's in system. There are added delays to simulate cross traffic based on a delay table. All I want to do is chart at what time they are being triggered at so I can make sure the logic is correct. (No training in flexsim what so ever, so keep answers in lay man terms please). Multiple delay points exists in system.

FlexSim 17.2.3
chart
· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Sam Stubbs avatar image
0 Likes"
Sam Stubbs answered tannerp rolled back

Is this the same model we worked on over the phone? If so, you could just have a Custom Code activity after each delay/stop point in your Process flow (if I remember correctly, I think that's when it's stopping the agvs right?) Then record the current Model Time and save it to a table. Would that work for this situation?

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.