question

cai A avatar image
0 Likes"
cai A asked tannerp answered

problem of agv

I have some problems in my model.

1.I want that taskexecuter1 and taskexecuter2 go to do the unload and upload,but they can't move now.

2.I hope that taskexecuter1 and taskexecuter2 can unload the boxes stop in queue2 queue3 queue4 queue5 and then go unload in sink1 is that impossible?

model.fsm

FlexSim 18.2.0
agvcontrol pointsunloadtaskexecuterupload
model.fsm (24.9 KiB)
· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

tannerp avatar image tannerp commented ·

What are you using to control your Task Executers? There is no Process Flow or other logic.

0 Likes 0 ·
cai A avatar image cai A tannerp commented ·

I want to use the process flow to complete this model,but I'm a beginner for flexsim.

Hope you can help to build process flow to solve this problem.

Thank you!

0 Likes 0 ·

1 Answer

·
tannerp avatar image
0 Likes"
tannerp answered

We could help create this model for you, but it would be significantly more beneficial for you to study the FlexSim tutorials to learn the basics. You can find the tutorials in the User Manual (Help -> User Manual -> Tutorials).

After reviewing the tutorials, you should be able to create your model according to your specific parameters and therefore have it be more useful to you. Members on the forum generally won't be able to build entire models for you, but if you have any specific questions while building your model, we're always happy to answer those.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.