Hi all,
I want to built the following model with this kind of settings: Soure-> Processor 1-> Processor 2 -> Sink. The duration of one shift is 480 min - 45 min (break) = 435 min (21600 seconds).
The source should create every 15 seconds a product. I know that I can use the scheduled sequence in the source to generate this but I do not know how to make it. The Processor 1 has a process time of 70 seconds, the processor 2 a process time of 60 seconds. My factory has to produce 320 items within one shift. How can I reach this?
Thank you very much!