question

Antonio R8 avatar image
1 Like"
Antonio R8 asked Joerg Vogel converted comment to answer

Is it possible to simulate only operational hours?

pretimingjobs-rev2.fsmI've got a mode in which the operational time is 7h hours a day. When I run the simulation it shows the 24h of the day. Is it possible to show only the operational hours?

FlexSim 19.0.2
operational hours
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered

You can add an timetable that control the runspeed of your model. In times that are counted as down you send a message to an object that is never stopped in your simulation run and set the runspeed to very huge value. In opposite times you set the runspeed by a message to a lower value back.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.