question

sara S2 avatar image
0 Likes"
sara S2 asked sara S2 commented

ASRSvehicle tasks priority.

Hello,

"ASRSvehicle1792" in figure1 performs three tasks: loading totes from "Queue2154", loading totes from "Queue1798" and loading totes from "Rack1788". In order to make those tasks priority equal to 1, 2 and 3 respectively, I set priority = 1.00 for the first task (figure2), priority = 2.00 for the second task (figure3) but for the third task I didn't set any priority (figure4) because it is managed by the process flow "ProcessFlowCW".

Would this allow to execute the three tasks in the mentioned order without fixing a priority of the third task?

(FlexSim version 19.0.0)

Regards.

Other (please specify)
Other
priorityasrs vehicle
figure1.png (35.6 KiB)
figure2.png (16.2 KiB)
figure3.png (16.0 KiB)
figure4.png (102.0 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
tannerp avatar image
0 Likes"
tannerp answered sara S2 commented

The Process Flow also allows you to set a priority. The Create Task Sequence activity has a variable for Priority. I recommend setting this up in your Process Flow so that as the ASRS vehicle receives tasks from the 3D logic and Process Flow, it completes them in the correct order.


ts-priority.png (14.9 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

sara S2 avatar image sara S2 commented ·

@tanner.p, thank you for your help.

1 Like 1 ·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.