Hi,

For every production (box from the source in the 3D model), I create a token in process flow which has divided (by create token) to 10 tokens based on rows of “Mproduction task” Global table to show different tasks:

1- I want to create a label for every 10 tokens based on “Mproduction task” Global table in which every token receives one of the task names (e.g. task 1) as a label and its related preassembly time as its value.

So that every operator could be responsible for one of the tasks.

2- The tasks have priority. Task 1 should be done at first, then the other 10 tasks should be done but with no priority over each other and the last task should be performed when all tasks have been finished.

Could you please help me with these questions?

Thank you in advance.

production plan.fsmproduction plan.fsm


FlexSim 20.1.3
global tableflexsim 20.1.3assign labels
production-plan.fsm (47.0 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Jeff Nordgren avatar image
0 Likes"
Jeff Nordgren answered Vahideh M commented

@vahideh.m,

Attached is you model with the changes that I've made. I'm not sure I understand exactly what is supposed to happen but this is what I came up with. Take a look at the attached model and see if something like this would work for you.

Thanks.

production-plan-JN1.fsm


· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Vahideh M avatar image Vahideh M commented ·

It was a good solution.

Thank you for your time.