3D Model and Process Flow

Is it possible to use process flow just for one part of the model, and complete the rest with 3D Connexion Modelling ?

If so, how can I apply the process flow for this particular part, for example unloading of merchandise

FlexSim 20.2.3
processflowflexsim 20.2.33dconnexion
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Ben Wilson avatar image Ben Wilson ♦♦ commented ·

Hi @Esteban B2, was Jeanette F's answer helpful? If so, please click the red "Accept" button on their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

·
Jeanette F avatar image
1 Like"
Jeanette F answered Jeanette F commented

Hello @Esteban B2,

Yes, it is possible to use process flow for select portions of your 3D model and the rest be run by the model's logic.

Your unloading merchandise process flow can be started by a Watch for Event Source and you can use the Create Objects to unload the objects onto a designated Queue. Any label assigned in the process flow can be assigned to the item in the 3D model.

· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Joerg Vogel avatar image Joerg Vogel commented ·

Please do the Process Flow Tutorials. They all start with 3D models.


0 Likes 0 ·
Jeanette F avatar image Jeanette F ♦♦ commented ·

Hello @Esteban B2

This post shows an example of using process flow like you asked.

0 Likes 0 ·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.