question

Joseph L4 avatar image
0 Likes"
Joseph L4 asked Eric M commented

Two process flows are interfering with each other

I want to use two process flows on the same sheet for two different production lines. The problem I am running into is that the operator is carrying the pallets from the 2nd production line up to the combiner of the first. I am unsure why this is happening because I don't think "Combiner1" is anywhere in the 2nd process flow, but for whatever reason it is still occurring. What could be causing this problem?interiorLine-0.fsm

FlexSim 21.1.4
processflowinterfering
interiorline-0.fsm (134.6 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Eric M avatar image Eric M commented ·

Hi @Joseph L4, was Jordan Johnson's answer helpful? If so, please click the red "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

Jordan Johnson avatar image
1 Like"
Jordan Johnson answered

To debug your model, I ran it to about time 18.36 (8:00:18 am), because that's when I noticed the second operator going towards Combiner1. So I stopped the model at that point, and looked at the token that was directing the task of the operator. It looks like a copy-paste issue, where not everything got updated:
1626110942702.png

So I think that's the reference to Combiner1 in the second flow. There may be others in similar spots.


1626110942702.png (101.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.