question

Sean B avatar image
0 Likes"
Sean B asked Jeanette F answered

ASRS Crane not pulling from racking after delay time

I have the items being stored in the racking by the different cranes and staying for a certain amount of time, but when the items are ready to be pulled from the racking to the outbound conveyors the system throws an error and doesn't proceed. I have the cranes "s-linked" to the outbound conveyors but they are not working properly. Any help would be greatly appreciated.

Currently my file size is too large to attach and I'm not sure why, but attached is the system and error that is being thrown.


1628777942289.png

FlexSim 21.0.3
flexsim 21.0.3asrs vehicle behaviourracking
1628777942289.png (495.8 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Felix Möhlmann avatar image Felix Möhlmann commented ·
If you are using the "Use Transport" option on the racks with the default value of "current.centerObjects[1]", the task executers (cranes) have to be connected to the racks via "s-connection", not to the out-object.

Racks 3-6 already seem to be properly connected in your screenshot.


0 Likes 0 ·

1 Answer

·
Jeanette F avatar image
0 Likes"
Jeanette F answered

Hello @Sean B,

As Felix said, your racks and your conveyors both need to be center port connected (S key) to the ASRS. For us to be of more help to you, you can upload your file to a cloud folder and then share the link with us.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.