I am running an assembly line simulation and have approximate times for operator work at each station. I am instructed to use Lognormal distribution to run throughput and station/operator utilization. Is it possible to set upper and or lower limits to the distribution selections within a delay command? I am getting results at up to 3x the time per station that it should take on average and that skews my data to be inaccurate. Kind Regards,