Dear all,
I have two questions regarding timetables and I would appreaciate your collaboration.
- I assigned a timetable to the processor. Whenever the break arrives, the part is stuck in the machine. I would like the processor to do some extra work until the processing of the part is finished and consider the extratime as extrawork. How can I do this?
- I have a list with parts to be processed by a processor that includes the process time of each of the parts (each part has a different process time). I want the processor to pull the parts of the list only if it is possible to do it before the break time arrives (with a possibility of 15 min extra time). How can I do this?
Thank you,
Helen