Hi there,
I'm trying to make a process flow where the agv needs to wait for a processor to be done with the box before being able to proced to the next control point where it unloads the box.
In this case specifically the control point is the ControlPoint6 and the processor is the Processor1.
Every AGV has to wait on the Controlpoint6 to deliver the box before going to ne next part of the cycle.
Can someone help me with that?
Thanks in advance!