I would like to run batches of different products through a production line. Each product correlates with a different MTBF/MTTR of the line. I could think of a way of implementing it through labels and tables. However, I realize that I need to understand more about what would actually happen under the hood. Is the up time timer reset when I change the MTBF mid-run or at which time is the next failure time sampled?