Hello,
I'm trying to analyze a waste management system. Waste is accumulated to a certain level (between 5 and 10) in a container (queue 1) and then moved to a bigger container (queue 2). I managed to open and close ports in a certain threshold (not a range) but I'm not able to move it to the second container in a batch. Can someone help me with this?
Thank you in advance,
Myriam