I have questions, If I've 9 people and I've 3 processes (collecting,verification,dispensing) to have people, Then , By person need to work different time. such as person 1 09-00-11.00 am do to collecting process and break and then 1.00-2.00 pm do the process verification, then dont have in sytem.
How to do like this. and If any, Where to setting by person. and For the next I want to optimize people on each process should have in each time. for reduce time in system of each token (Prescription) or reduce backlog of each tokens (prescription),.