Details go to the middle section through the skin for 21 seconds. and cut to the buffer zone Queue1 Then the part is automatically processed from Queue1 to the Processor 2 machine, which takes 17 seconds. After processing is completed on processor 1, the machine and the part that were about to change their color to red to indicate the increase in their temperature, then the machine cools down simultaneously with the processed part for 6 seconds.
After cooling is complete, the part and the machine change their color to green and the part is sent out.