question

Alonso avatar image
0 Likes"
Alonso asked Joerg Vogel edited

Assembly line failure

Good morning, I have a problem with the model I share, operator 5 located on the blue plane must only assemble red boxes, that is, blue pallets must go through the direct post as he then assembles pallets with red, I did the example but it is stopping the line. The other two lines follow correctly. If I appreciate it, someone can help. thanks,


1734089237694.png



modelo-assem-1-4 (3).fsm

FlexSim 24.2.2
flowitemprocesflow
1734089237694.png (92.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
1 Like"
Joerg Vogel answered Joerg Vogel edited

Set Assign Event to for example to token.decPnt (Event driven source activity). Based on this you can identify a decision point and make a decision relative to stop an item in your case the pallet.

If you don't want to compare pointers, you can compare strings by property name. You do this in a source code or more activities.

Some connections got a name equal to decision point names to evaluate a made decision. It is a switch by case structure in process flow.

Conv_grp_DP_Decide_onArrival_by_Type.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.