I do not know, but I think this problem is a bit difficult to solve
1. My Processor (Assembly) I have Around 5 minutes. And I have only 1 Processor.
2. The Operator Insert a Item in Processor, but this Processor (Heater) is so much Slow (around 30 minutes). And Is possible isert ONLY ONE item in each Porcessor each 30 minutes. And I have 5 Processor (Heater)
3. The Transport of item between (Assembly and Heater) will be done by Operator, so this Operator Will you need to know which (Heater) is full because the time (30 Minutes) not finish yet and Insert the insert this item in a Heater Empty
So is possible to do this?