How to "schedule" flow items based off of model completion?

source-arrival-schedule.fsmI'm having difficult trying to explain this in words so bear with me. In the model attached, I'm trying to create an arrival "schedule" based off a per-week demand. I'm creating "lots", which are four flowitems from separate sources, each source/flowitem is an ingredient that makes up one "Lot". We have three sizes of Lots, 1 mg, 2 mg, and 3 mg.

My goal is to have my model represent different amounts of lots in a scenario that may frequently changed based off of our demand. An example would be, in a two week period, (3 shifts, 8 hours/shift) I need to make 3 lots of the 1 mg, then one lot of the 2 mg ,then back to three 1 mg lots and finish with 1, 2 mg lot. Then, in the third week, make 3 lots of 1 mg, and 1 lot of 3mg.

I know how to create schedules based on model time, or specific hours in the day etc. Again, sorry for the wordiness and confusing request.

FlexSim 18.2.0
schedule sourceschedulingscheduled arrivalschedule processor
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joshua S avatar image
0 Likes"
Joshua S answered Joshua S commented

Here's an example to schedule everything, I made some additions to your model. I added a table called "LotTable" where you can enter the amount of each ingredient it takes for each Lot. In process flow I added a DateTime source where you specify when each of these orders come in. The Create Object activities are each linked to a queue and creates the amount of ingredients per lot specified in the "LotTable" table.14182-source-arrival-schedule.fsm