the problem of taskexecuter and agv(2)

I want to let our all of boxes unload in sink5.(From queue&sink1~4 are assign to the label in control points) Is that impossible?final.fsm

FlexSim 18.2.0
agvprocess flowcontrol pointsunloadtaskexecuter
final.fsm (45.4 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

gilbert jerald avatar image
0 Likes"
gilbert jerald answered cai A commented

@cai A

Hi,

I have modified your model as per your constraint. Have a look at it.

The below image states the code(By getting the total number of an item is loaded in the AGV) to unload all the items in sink 5.

support-agv.fsm

Thanks


support-agv.png (31.9 KiB)
support-agv.fsm (45.4 KiB)
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

cai A avatar image cai A commented ·

Thanks for your helps.

But I want to let the model load in queue1~queue5 and unload in sink1~sink4 by assign to labels and then still have the accumulation of boxes on the taskexecuter(had already work in queue1~5&sink1~4 and go to unload in sink5) ,so I want to let all of accumulations of boxes upload in sink5. And then go to the next cycle.

Is that impossibe?final.fsm

0 Likes 0 ·
final.fsm (45.4 KiB)
gilbert jerald avatar image gilbert jerald cai A commented ·

Hi,

From your comment based on my understanding, I have made some changes on the model as per your constraint. I have attached the model for your reference have a look at it. Let me know if anything required in this model.

Thanks

support-agv-1.fsm

0 Likes 0 ·
support-agv-1.fsm (48.1 KiB)
cai A avatar image cai A gilbert jerald commented ·

Thanks for your helps.Your model help us very much.But I still have some problem.And I post a new article,hope you can help me again and modified my model.Thank you!

0 Likes 0 ·