I have a company that produces 3 different types of screws, example type 1 production is 50%, type 2 is 30% and type 3 is 20%.
I have a company that produces 3 different types of screws, example type 1 production is 50%, type 2 is 30% and type 3 is 20%.
What do you mean, you need another way? What way are you doing it now? And why wouldn't that work? If you could download your model or a sample model of the problem, we would be better able to give you a specific answer to your model question.
Thanks.
So what exact;y do they want different? do they want batches of a certain number, with a percentage of those batches being a certain type? Or do they want something else different?
Take a look at your attached model with the changes that I've made. The only changes I made were in Processor4. Is this what you had in mind? If not, please let us know what doesn't work right.
Thanks.
I'm super happy with the modification he made, I thank him for his time and his help!Al aire libre
10 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved