Good day. I have a partially complete model C (attached) but the problem is that once a conveyor lane fills up with cartons and blocks the build back PE then the boxes destined for that lane as well as all the other lanes go straight to the dump sink. I intend for only the full lane to have it's parcels to go to the dump sink until the PE is clear again. Can anyone perhaps assist me please in correcting the code snippets so that only the "full lanes" parcels go to the dump sink when the respective build back PE is blocked? This model does not have anything to clear or empty the conveyor lanes on purpose fyi. Emptying of the conveyors / unloading them I will do in my other simulation. Thanks. 2020.06.02.05 Model C.fsm