question

Jhon Alexander SD avatar image
0 Likes"
Jhon Alexander SD asked Ben Wilson commented

Financial analysis. variable costs

Hi.

I want to do a financial analysis, where I can enter the variable costs, for example, maintenance, gasoline of the vehicles, etc.

16759-batch-picking-model-1-4-autosave-1_1.fsm



FlexSim 20.2.3
flexsim 20.2.3pickinglogisticsfinancial analysiscosts
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Ben Wilson avatar image Ben Wilson ♦♦ commented ·

Hi @Jhon Alexander SD, was vatic.group's answer helpful? If so, please click the red "Accept" button on their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

Vatic Group avatar image
2 Likes"
Vatic Group answered

Hi @Jhon,

You must bear in mind that the associated elements (operators, equipment, etc.) must be connected to something that makes them enter the state (Maintenance, fuel loading, etc.) that is desired, time tables are regularly used to this. Once they enter that state, financial analysis is used so that these elements have a cost depending on the entry into this state. for example if you look at the attached file you will find that in the financial analysis menu in group 1 -> States there is a value per entry of 100, which means that every time the elements enter the "Scheduled down" state it will see a value of 100 for each of the elements in the group. The time table I created is called "maintenance". 16759-batch-picking-model-1-4-autosave-1-1_1.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.