Hi,
I need to make a process and I don't know how to do it in Flexsim.
The process is explained below:
I have an item from a source 1 on a processor which is transported by a crane on a queue. Then I have a source 2 closed to this queue with an operator working on it, transporting the items from this source 2 to the queue.
What I want to do is:
Once the item is unload by the crane on the queue the operator leave another item from the source 2 on the queue before the next item from the processor is unload, so the operator make this operation before the second item from the processor is unload on the queue
I mean the crane has to wait until this operator finish its operation to transport the next item from the processor to the queue.
Someone can help me to solve this problem?
Thank you in advance.