question

Ilham T avatar image
0 Likes"
Ilham T asked Ryan Clark answered

HOW TO MAKE 1 AGV GROUP DO 2 TYPES OF WORK

Hello all,

I need help for setting agv, where i want to make 1 agv group do 2 work processes,

Between blue fields and red fields

1. Queqe4 to the blue square processor

2. From blue processor, to queqe 1

3. From queue 1 to all red box processors.

I have used 2 item list, but looking failed.

Is there anyone who can help?

Thank you Very much

NEW.fsm

FlexSim 19.0.0
agvflexsim 19.0.0agv process flow
1622295897675.png (361.0 KiB)
new.fsm (318.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Ryan Clark avatar image
0 Likes"
Ryan Clark answered

I don't know if you're still having issues with this, but AGVs can only have one Process Flow Class, but you can add various different tasks to the same work list for the AGVs. Just have all of the triggers push tasks to AGVWork. That should help with the logic problems.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.