question

Control Gn avatar image
0 Likes"
Control Gn asked Control Gn edited

Beef carcass deboning process

Good morning, I have a process that consists of a source that sequentially generates 8 different products, and they pass to a conveyor belt where there are 4 operators on one side and 4 operators on the other, each operator is assigned a specific product and in turn the processing time is different for each one of them, these operators usually tend to accumulate products since their processing speed is slower than the speed at which the products arrive at their position. YOUR URGENT HELP WITH THIS!
FlexSim 19.0.0
conveyoroperatorglobal tablesstationdesicion point
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

0 Answers