Hi,

I am trying to build and Item Trace Gantt with entries end exits in the middle of a process. This is a simplified version, but for some reason the chart is not registering the end at the exit objects. However If I add a sink, then it traces them correctly

item trace.fsm

Is this the expected behavior and I am missing something?

Thank you


FlexSim 22.0.1
gantt chartitem trace
item-trace.fsm (34.0 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Jordan Johnson avatar image
0 Likes"
Jordan Johnson answered Marcello Rosadini commented

This is a bug. I will add it to the dev list so that we can fix it on our end.

In the mean time, you can fix it on your end by:

  1. Install the chart
  2. Open the "Item Trace Gant Flow" process flow
  3. Find the Pull from List activity called "Check if entered end object"
  4. Check the box on that list to "Leave entries on list"
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Marcello Rosadini avatar image Marcello Rosadini commented ·
Thank you Jordan!
0 Likes 0 ·