Hello to the community,
Today I am confronted with a problem for which I cannot find the answer.
The process consists in assembling bikes in 6 operations (1 per processor),
The principle is as follows:
+Poste 1 manufactures for Poste 2
+Poste 3 manufactures for Poste 4
+Poste 5 is made for Poste 4
+An assembly is made with the parts of the processor 2,3 and 5.
+The whole is then brought to station 6
+I added a label to each operation in order to sort them out at Poste 7.
I'm not sure if this has anything to do with it but since I did this manipulation my simulation stops after the manufacturing of a single bike.
I'm still looking for causes on my side, but I'm not against an external opinion.
Have a nice day.