question

Michael C20 avatar image
0 Likes"
Michael C20 asked Jason Lightfoot edited

Post process send to port issues

Evening,

I have updated the product details to match, material A to product A, label number 1.

This has improved the front end for material movement. However once it has been through the process and goes back into the combiner, one product is packed off perfectly and transported to it's matching location.

However the rest either disappear into the sink, or the pallet only is transferred?

Can anybody help?

Again appreciate your input.

Model is: Production_sim_220822 V8

Thanks

Michael

FlexSim 22.1.3
send to port
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Jason Lightfoot avatar image
0 Likes"
Jason Lightfoot answered Jason Lightfoot edited

You have type 5 leaving press 2 through port 1. For the press send-to-port set the default to 2 and just have type 1 exiting through port 1 - remove all the other types and just let the default handle them.

Also, your component lists in the global tables no longer match the template description in the entry trigger. They should have one row (you have only on component connection in on port 2) and a column for each type that you will look up.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.