Hi @Felix Möhlmann ,
Based on the current AGV elevator process flow, the lifts will wait for the AGVs to unload before closing the door and to pick up the next available AGV. Is it possible to simulate it in a way where it would not wait for the AGVs to finish unloading (unloading time includes leaving the lift and a short travelling distance after leaving the lift), and would close the door once the AGVs leave the lift?
Thank you.