question

night avatar image
0 Likes"
night asked Jason Lightfoot commented

Varying the process time according to the number of operators?

I have a bunch of operators connected to a dispatcher which would send them the various separators that are empty, but my issue now is how can I program such that i can send out my operators such that there will no longer be any excess operators in the "rest bay" and ensure that each separator will still have one operator? And the process time will change according to how many operators there are? I am not sure how will the process time change since I do not have the figures for it. Is it possible to have flexsim to calculate it themselves?
1697872521516.png

Basically I have 9 operators and 3 separators, the separators work in random order, free for all basically.

FlexSim 23.1.1
operatordispatcherprocessortimeseperator
1697872521516.png (79.8 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jason Lightfoot avatar image
0 Likes"
Jason Lightfoot answered Jason Lightfoot edited

Check the answer to this question which is based on filling a table to define the work content on how long it would take with a different number of operators present from start to finish. From that understands the loss of productivity when people leave and join mid process.

· 6
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeanette F avatar image
0 Likes"
Jeanette F answered

Hello @night,

Here is one other solution that uses a tracked variable to track a dynamic processing time

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.