question

mohammadmajd avatar image
0 Likes"
mohammadmajd asked Jason Lightfoot answered

Operators shift

I have four operators and I have two time tables for day and night shifts. I have assigned two operator to night and two to day schedules. However, when the shift changes the day operators do not leave their work and therefore nothing gets processed. How can I fix this? I tried using different dispatchers for day/night operators but it did not fix the issue.

Thanks!

Shifts Example.fsm

FlexSim 23.0.7
timetables
shifts-example.fsm (51.9 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Jason Lightfoot avatar image
1 Like"
Jason Lightfoot answered

Connect from the operators back to the dispatcher so that when you give the operator the pre-empting task sequence it will return it to the dispatcher for completion. Note you can also close/stop the operators inputs to prevent it from receiving new tasks.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.