I encountered a problem during the process of learning processflow, which is that when my goods arrive at the designated location and trigger an event, I pull out a CRANE from the list to handle the transportation task. However, it is possible that all overhead cranes are busy, and this trigger event will fail. The goods will continue to wait in place. Is there any good solution to this situation

FlexSim 24.0.2
process flow
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeanette F avatar image Jeanette F ♦♦ commented ·

Hi @happyboy, was Felix Möhlmann's answer helpful? If so, please click the "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always comment back to reopen your question.

0 Likes 0 ·

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered

By default a token will wait in a Pull from List activity until the pull is successful. So while an item might have to wait until there is a crane available, it should be moved eventually, if you didn't change any settings.

If this is not what you expect, what would you want to happen in the case of there being no available cranes?