Hello
In this model, I have trucks that arrive at a certain factory and are parked waiting for the loading time/window.
To simulate the parking lot, I created a floor storage. When the loading window "opens", the truck must leave the parking lot and move to one of the occupied docks. However, the truck does not follow the network node defined in the Process Flow.
Problem route network node.fsm