question

Sakamoto Ko avatar image
0 Likes"
Sakamoto Ko asked Jeanette F commented

About the control point on the intersection.

Hi.


I think we can see on which path the controlpoint is placed by looking at path node in the controlpoint's node.

1733491391558.png


However, when placed on a transfer point, there will be two of these nodes, which path is it actually supposed to be placed on?

1733491536081.png


Also, when a controlpoint is placed on a transfer point that has already been created, in what order are they stored in the path node?

1733491604497.png

By checking this, I would like to better manipulate the direction of the AGV when it is reset.


Thank you in advance.

FlexSim 24.0.2
agvcontrolpoint
1733491391558.png (41.0 KiB)
1733491536081.png (97.3 KiB)
1733491604497.png (23.0 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeanette F avatar image Jeanette F ♦♦ commented ·

Hi @Sakamoto Ko, was Jordan Johnson's answer helpful? If so, please click the "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always comment back to reopen your question.

0 Likes 0 ·

1 Answer

Jordan Johnson avatar image
1 Like"
Jordan Johnson answered

If a control point is placed on a transfer, and an AGV is connected to that point, then the AGV will choose an arbitrary path to start on. There isn't a good way for you to control which path is the start path. If the AGV is required to start on a specific path, then you'll need to place a control point on the path, not on they intersection.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.