question

ola avatar image
0 Likes"
ola asked

How to free operator after start of cycle

Hello,

I am creating a manufacturing process simulation in Flexsim 23, using Process Flow. What design to choose from the bibltiotheque to free the opertor after the cycle starts on machine. The cycle of the machine is represented by the object “delay” .

As in the example below:

Operotr Op1 approaches the machine OP335-we have a synchronization that there must be a token and operator on the machine, then I would expect operator to be released so it can go to start another cycle on other machine OP330, then return to the first machine and unload it.

1737129249322.png



FlexSim 23.1.4
process flowfree operator
1737129249322.png (32.1 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

0 Answers