question

Antonio Tartaglione avatar image
0 Likes"
Antonio Tartaglione asked Ben Wilson commented

model using a pull strategy

How can I build a model that works with a pull strategy and in an assemble to order ambient?

I have a demand distributed in a year and a process routing for each item.

Choose One
pull strategypullflowitem routingpull requirement
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Rodrigo Lamas avatar image
0 Likes"
Rodrigo Lamas answered Rodrigo Lamas edited

@Antonio Tartaglione Please, see this example pull with List. I think that is you are looking for! Regards. https://answers.flexsim.com/articles/19561/list-connectionless-routing-example-5.html

· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Antonio Tartaglione avatar image Antonio Tartaglione commented ·

I can't open the link

2 Likes 2 ·