Create dynamic lists in process flow

Hello,

First, let me explain the process in attached model.

- Two kinds of item type with different flow route.

- Two production lines.

- Item transport by operators. Station process use operators.

- About the global table:

Itemtype1 - Process1 use processor a or b (i.e. A/a1, A/a2, A/b1, A/b2, B/a1, B/a2, B/a3, B/a4, one of them).

Itemtype1 - Process2 use processor c and must in same production line (if process1 use A/a1, then process2 can only use A/c).

- Flow control use first available, but selection stations will change in regard to item's type and process step, so I use list.

---

My question is, how to build station lists for dividual item by using script?

On item exits from a station, how to notify waiting item that this station is available now?

---

2017.03.28 Updated :

I think my question is solved, thanks.

dynamic-list-6.fsm

FlexSim 17.0.3
processflowlistpartitions
dynamic-list-6.fsm (47.9 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Sam Stubbs avatar image Sam Stubbs ♦ commented ·

The model you attached seems to be corrupted somehow, in the Fixed Resource Process Flow, it throws several errors, when trying to open that Process Flow view. Do you have this same response in your file on your computer?

0 Likes 0 ·

1 Answer

·
Sam Stubbs avatar image
0 Likes"
Sam Stubbs answered

Original poster updated this questions with:

"2017.03.28 Updated :

I think my question is solved, thanks."

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.