question

Michael P2 avatar image
0 Likes"
Michael P2 asked Cliff King edited

Modeling staff requirements as percentage of process time

Hello,

For a procedure room, the physician typically only spends a percentage of time in the room whereas nurses and other staff may attend the entire procedure. What is the most elegant way to model the physician staff requirement as percentage of processs time? Do I have to split it into multiple objects?

Choose One
staff requirement
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Cliff King avatar image
0 Likes"
Cliff King answered Cliff King edited

No need to split into multiple objects, but you will need to split the process into multiple activities that all begin in parallel (typically by all having the same predecessor requirement).

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.