question

Ale avatar image
0 Likes"
Ale asked Sam Stubbs answered

Process Flow

cell-2-2.fsm2.png1.jpg

Hi,

On my model I changed from one operator to a group of operators to perform and activity. None of the group operators are performing their activity and I cant figure out why. Do I have to write a Query on the acquire activity? I want to send an operator that is available to perform the activity(just one) and not all at the same time.

Thanks!

Other (please specify)
Other
process flow
1.jpg (71.2 KiB)
2.png (330.8 KiB)
cell-2-2.fsm (775.4 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Sam Stubbs avatar image
2 Likes"
Sam Stubbs answered

Your acquire activity is trying to acquire an operator from the Cordset Operator resource, but that resource is only a singular object. (The amount is just written as 1) IF want a whole group to be part of the Resource, you'll need to create a group, and then assign members to that group, and then assign that Group to the resource.


acquiregroup.png (14.8 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.